Opportunity Rover Reaches First Target In Crater | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 28, 2007

Opportunity Rover Reaches First Target In Crater

Mission Has Lasted Over 14 Times Longer Than Planned

NASA's Mars Exploration Rover Opportunity has reached its science team's first destination for the rover inside Victoria Crater, information received from Mars late Tuesday confirms.

The space agency tells ANN Opportunity has descended the inner slope of the 800-meter-wide crater (half a mile wide) to a band of relatively bright bedrock exposed partway down. The rover is in position to touch a selected slab of rock with tools at the end of its robotic arm, after safety checks being commanded because the rover is at a 25-degree tilt. Researchers intend to begin examining the rock with those tools later this week.

"This will be the first of several stops within this band of rock," said Steve Squyres of Cornell University, Ithaca, NY, principal investigator for the science payloads on Opportunity and its twin rover, Spirit. "By sampling it at several different levels in the crater, we're hoping to figure out the processes that led to its formation and its very distinctive appearance."

Opportunity drove 2.25 meters (7.38 feet) on September 25 to get the selected flat rock within reach. That was the 1,305th Martian day of the rover's mission... which was originally planned for 90 Martian days.

After entering the crater on September 13 for a multi-week investigation of rock exposed inside, the rover advanced toward the bright band with drives of 7.45 meters (24 feet) on September 18, and 2.47 meters (8 feet) on September 22.

"We have completed several successful drives with Opportunity inside Victoria Crater," said John Callas, Mars rover project manager at NASA's Jet Propulsion Laboratory, Pasadena, CA. "The rover is experiencing slopes as high as 25 degrees at some places, but wheel slippage has only been around 10 percent."

Spirit, meanwhile, is exploring the top surface of a plateau called "Home Plate," where rocks hold evidence about an explosive combination of water and volcanism. JPL, a division of the California Institute of Technology, Pasadena, manages the Mars Exploration Rover project for the NASA Science Mission Directorate, Washington.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC