Opportunity Rover Reaches First Target In Crater | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 28, 2007

Opportunity Rover Reaches First Target In Crater

Mission Has Lasted Over 14 Times Longer Than Planned

NASA's Mars Exploration Rover Opportunity has reached its science team's first destination for the rover inside Victoria Crater, information received from Mars late Tuesday confirms.

The space agency tells ANN Opportunity has descended the inner slope of the 800-meter-wide crater (half a mile wide) to a band of relatively bright bedrock exposed partway down. The rover is in position to touch a selected slab of rock with tools at the end of its robotic arm, after safety checks being commanded because the rover is at a 25-degree tilt. Researchers intend to begin examining the rock with those tools later this week.

"This will be the first of several stops within this band of rock," said Steve Squyres of Cornell University, Ithaca, NY, principal investigator for the science payloads on Opportunity and its twin rover, Spirit. "By sampling it at several different levels in the crater, we're hoping to figure out the processes that led to its formation and its very distinctive appearance."

Opportunity drove 2.25 meters (7.38 feet) on September 25 to get the selected flat rock within reach. That was the 1,305th Martian day of the rover's mission... which was originally planned for 90 Martian days.

After entering the crater on September 13 for a multi-week investigation of rock exposed inside, the rover advanced toward the bright band with drives of 7.45 meters (24 feet) on September 18, and 2.47 meters (8 feet) on September 22.

"We have completed several successful drives with Opportunity inside Victoria Crater," said John Callas, Mars rover project manager at NASA's Jet Propulsion Laboratory, Pasadena, CA. "The rover is experiencing slopes as high as 25 degrees at some places, but wheel slippage has only been around 10 percent."

Spirit, meanwhile, is exploring the top surface of a plateau called "Home Plate," where rocks hold evidence about an explosive combination of water and volcanism. JPL, a division of the California Institute of Technology, Pasadena, manages the Mars Exploration Rover project for the NASA Science Mission Directorate, Washington.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC