Next Departure For Mars Stands Ready To Fly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Fri, Aug 03, 2007

Next Departure For Mars Stands Ready To Fly

A NASA robotic explorer equipped to dig up and analyze icy soil on Mars sits atop a 13-story tall stack of rocket engines prepared for liftoff before sunup on Saturday.

A Delta II launch vehicle will carry the Phoenix Mars Lander into Earth orbit and, about 90 minutes later, give it the push needed to send it to Mars. A three-week period when planetary positions are favorable for this launch begins with an opportunity at 5:26:34 a.m. EDT on Aug. 4. A second opportunity the same day, if needed, will come at 6:02:59 a.m. EDT.

"We have worked for four years to get to this point, so we are all very excited," said Barry Goldstein, Phoenix project manager at NASA's Jet Propulsion Laboratory, Pasadena. "Our attention after launch will be focused on flying the spacecraft to our selected landing site, preparing for surface operations, and continuing our relentless examination and testing for the all-important descent and landing on May 25 of next year."

Phoenix will travel 422 million miles in an outward arc from Earth to Mars. It will determine whether icy soil on far northern Mars has conditions that have ever been suitable for life.

Studies of potential landing sites by spacecraft orbiting Mars led NASA to approve a site at 68.35 degrees north latitude -- the equivalent of northern Alaska -- and 233.0 degrees east longitude.

"Phoenix investigates the recent Odyssey discovery of near-surface ice in the northern plains on Mars," said Phoenix Principal Investigator Peter Smith of the University of Arizona, Tucson. "Our instruments are specially designed to find evidence for periodic melting of the ice and to assess whether this large region represents a habitable environment for Martian microbes."

The Phoenix mission was proposed in 2002 by an international team led by Smith. Twenty-four other teams also submitted proposals to be the first Mars Scout mission. NASA chose Phoenix in 2003. Phoenix uses a lander structure built for the 2001 Mars Surveyor mission, which was scaled down before launch to an orbiter-only mission.

"The spacecraft system and software development matured early in the program. This enabled us to thoroughly test a stable lander design over the entire integration and test schedule period," said Ed Sedivy, spacecraft program manager for Lockheed Martin Space Systems.

The Phoenix mission is led by Smith, with project management at the JPL and development partnership at Lockheed Martin Space Systems in Denver. The NASA Launch Services Program at Kennedy Space Center and the United Launch Alliance are responsible for the Delta II launch service. International contributions are provided by the Canadian Space Agency; the University of Neuchatel, Switzerland; the University of Copenhagen, Denmark; the Max Planck Institute, Germany; and the Finnish Meteorological Institute. JPL is a division of the California Institute of Technology in Pasadena.

FMI: http://phoenix.lpl.arizona.edu, www.nasa.gov/mars

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC