FAA Proposes ADs For Some Piper Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Nov 10, 2017

FAA Proposes ADs For Some Piper Airplanes

Wing Spar Corrosion Prompts The Measure

The FAA has published a proposed AD in the Federal Register for certain Piper Aircraft, Inc. Models PA–28–140, PA–28–150, PA–28–160, PA–28–180, PA–28–235, PA–32–260, and PA–32– 300 airplanes.

The proposed AD would require installing an inspection access panel in the lower wing skin near the left and the right main wing spars if not already there, inspecting the left and the right main wing spars for corrosion, and taking all necessary corrective actions.

The FAA has received two reports of significant corrosion found on the main wing spars of the airplanes covered by the AD. The corrosion was found during maintenance in an area that is not easily accessible for inspection. This condition, if not detected and corrected, could cause the main wing spar to fail. This failure could result in loss of control.

Piper Service Bulletin No. 1304, dated August 23, 2017 describes procedures for installing an inspection access panel in the lower wing skin near the left and the right main wing spars, if not already there, inspect for corrosion, and, if corrosion is found, taking all necessary corrective actions.

The FAA estimates that estimate that this proposed AD affects 11,476 airplanes of U.S. registry. The estimated cost of compliance is $170 per aircraft for the inspection, and $685 per airplane for parts and labor for the installation of the inspection access panel.

The proposed AD is open for comments until December 22, 2017.

(Image from file)

FMI: www.gpo.gov/fdsys/pkg/FR-2017-11-07/pdf/2017-24083.pdf

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC