Boeing Starting Production Of KC-46 Tanker Refueling Boom | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Oct 18, 2012

Boeing Starting Production Of KC-46 Tanker Refueling Boom

Program Shifting Into Production From Design Work

Boeing has started assembling the first refueling boom for the U.S. Air Force's next-generation aerial refueling tanker aircraft in the KC-46 Boom Assembly Center that opened Tuesday at Boeing Field in Seattle. "We're pleased that this facility opened on schedule," said Maureen Dougherty, KC-46 vice president and program manager for Boeing. "The KC-46A will feature a modernized fly-by-wire boom based on the proven system on the U.S. Air Force's KC-10 tanker, which will give it advanced refueling capabilities, allowing it to refuel any fixed-wing receiver aircraft anytime and on any mission."

Boom assembly marks the program's shift to production from design activities. "It's a big day for the KC-46 Tanker Program and the U.S. Air Force," said Maj. Gen. John Thompson, U.S. Air Force Tanker Program Executive Officer and KC-46 Program Director. "Boeing continues to make good progress toward delivering the KC-46 Tanker on schedule."
 
The first boom will enter testing during the third quarter of 2013 at a System Integration Lab (SIL), known as SIL 0. It is one of five labs designed to reduce risk for avionics and aerial refueling integration. Boeing invented the air refueling boom and has been building, upgrading and modifying them for more than 60 years.
 
Boeing's KC-46 program remains on track to deliver 18 combat-ready tankers by 2017, and for the next major Air Force contract milestone, the Critical Design Review, scheduled for the summer of 2013.
 
Production of the KC-46 aircraft begins next summer in Boeing's Everett, WA, factory. The aircraft will be a 767-2C variant of the commercial 767-200ER airplane. Boeing will build 179 next-generation aerial refueling tanker aircraft to begin replacing the Air Force's aging KC-135 tankers.

(USAF artist's rendering of KC-46A in flight)

FMI: www.boeing.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC