Urgent AD (AUS): Robinson R44 Series | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Dec 02, 2003

Urgent AD (AUS): Robinson R44 Series

AD/R44/20 Main Rotor Swashplate and Tail Rotor Bolts 1/2004 TX

Applicability: Model R44 helicopters.

Requirement: 1. For all R44 and R44 II helicopters except those serial numbers specified in Requirement 2 of this Directive:
a. Determine if maintenance has been performed after 7 February 2003 on the areas specified in Figure 1 of this Directive, and determine if any bolt, part number NAS6605-31, shown on Figure 1 has been replaced for any reason.
b. If any bolt has been replaced, or if it is uncertain whether any bolt has been replaced after 7 February 2003, remove the paint from the bolt head to reveal the vendor identification marking. Determine if the bolt vendor identification is 01DO.
(i) If the vendor identification is 01DO, comply with Requirements 3 and 4.
2. The following R44 and R44 II helicopters must comply with Requirements 3 and
4 of this Directive:
a. Model R44 helicopters, serial numbers 0210, 0565, 0641, 0987 and 1312 through 1349, except 1345 and 1346; and
b. Model R44 II helicopters, serial numbers 10010, 10062, and 10083 through 10212, except 10092, 10173, 10204, 10207, 10210, and 10211.
3. For the helicopters affected by Requirements 1.b.(i) and 2. of this Directive, accomplish the following:
a. Visually inspect each bolt for fretting residue under the bolt head, which indicates a loose, potentially cracked bolt.
b. Apply 10-15 ft-lb (13-20 Nm) torque to each bolt head and verify no
rotation. See Figure 1 of this Directive.
c. If residue or rotation of the bolt is found, replace each affected bolt with a serviceable bolt that does not have a vendor  identification marking of 01DO.
4. For the helicopters affected by Requirements 1.b.(i) and 2 of this Directive, replace each bolt, part number NAS6605-31, that has vendor identification marking 01DO on the bolt head, with a serviceable bolt, part number NAS6605-31, that has an alternative vendor identification marking.
Bolt part number NAS6605-31 with vendor identification marking 01DO on the bolt head, is not to be installed on any helicopter. Note 2: FAA Emergency AD 2003-24-51 refers.

Compliance: 1. Before further flight after 3 December 2003.
2. At the times specified in Compliance 3 and 4.
3. Before further flight after 3 December 2003, and thereafter before first flight of each day of operation.
4. Within 10 hours time in service or before 31 December 2003, whichever occurs first; after determination of vendor identification and/or helicopter applicability.
This Airworthiness Directive becomes effective on 3 December 2003.

Background: The FAA received a report of the failure of the bolt that secures parts of the main rotor swashplate and attaches the tail rotor blade. Investigation revealed that the bolt failed due to hydrogen embrittlement. Hydrogen embrittlement is suspected to have occurred during the cadmium plating process of an entire batch of bolts, which makes the batch suspect.

FMI: www.casa.gov.au/avreg/aircraft/ad/ADfiles/Rotor/r44/R44-020.pdf

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC