Pentagon Documents Show U.S. Waived Laws For F-35 Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jan 07, 2014

Pentagon Documents Show U.S. Waived Laws For F-35 Program

Incorporated Chinese-Made Parts To Keep The Fighter On Schedule

Chinese parts have been used in the F-35 Joint Strike Fighter, according to Pentagon documents obtained by the media, and the U.S. government had to waive laws to allow the parts to be incorporated on the airplane.

In the documents reviewed by Reuters, the Pentagon's top arms buyer Frank Kendall allowed Northrop Grumman and Honeywell to use magnets manufactured in China for the plane's radar system, as well as landing gear and other components on the airplane by granting waivers to U.S. import laws. Without those waivers, the companies would have been in violation of federal laws and the program could have faced further delays.

The Government Accountability Office is reportedly looking at three cases. None of the parts were expensive, according to the report. An example is a $2 magnet installed in test, training, and production aircraft that according to the documents would have cost millions of dollars to retrofit with allowed parts and forced lengthy delays in delivering the airplanes. They are included on airplanes currently flying and scheduled for delivery through May of 2014.

The GAO report is due to be released in March. It was reportedly ordered by lawmakers expressing concerns about U.S. firms being excluded from the specialty metals market, as well as the dependency of a U.S. weapons system on parts made by a potential adversary.

(Image from file)

FMI: www.gao.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC