NASA Looks For Ways To Trim SLS, Orion Development Costs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Nov 22, 2016

NASA Looks For Ways To Trim SLS, Orion Development Costs

Request For Information Seeks Input From The Public On Cost Reductions

NASA has posted a Request for Information (RFI) calling for input from the public on how the agency might trim the cost of developing its Space Launch System and Orion capsule.

According to the description page posted to the GSA website: "NASA" invites industry and academia to submit responses to this Request for Information (RFI) to assist NASA in maximizing the long term efficiency and sustainability of the Exploration Systems Development (ESD) programs, including the Space Launch System (SLS), Orion, and Exploration Ground Systems (EGS) by minimizing production, operations, and maintenance (POM) costs. NASA will use information obtained as a result of this RFI on a non-attribution basis as part of future planning. The information submitted in response to this RFI will inform future acquisition approaches and concepts."

The Agency says in the document that with the ESD programs now past their respective critical design reviews (CDRs) and the Exploration Mission 1 (EM-1) flight articles in production, "NASA is transitioning from design and development to long-term affordability and sustainability within a broader exploration framework.  In this evolving environment, NASA is looking to transform traditional acquisition approaches and acquire services with low overhead and additional direct accountability to providers for those acquired services.  For NASA to change acquisition methods, considerations of proprietary design and intellectual property should be discussed.  Further considerations that allow an effective corporate business plan should be discussed. The approach should discuss the sustainability of a new acquisition process from a corporate revenue position."

There is some sense of urgency to the RFI, as the federal government will be under new management in January. While President-elect Trump has said that he wants NASA to concentrate on the exploration of Mars ... the prime mission for the SLS and Orion ... budget cuts to NASA could make that far more challenging.

Engadget reports that Bill Hill, NASA's Deputy Associate Administrator for Exploration Systems Development, told Ars Technica earlier this year that the program is "just way too expensive today. It's going to take some different thinking and maybe a little bit more risk taking than what we're wanting to do today."

While private space companies such as SpaceX, ULA and Blue Origin have heavy-lift rockets under development. What remains a wildcard is whether NASA will be able to build and maintain a heavy-lift system that will be competitive with those built by private industry. The agency hopes President Trump will continue to invest in the SLS and Orion projects, and that it will be flying by 2023.

The deadline for making input into how the programs might save some money is December 23.

(Artist's rendering of SLS pictured in file photo)

FMI: RFI

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC