NASA: Maybe a Year Before Next Shuttle Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Oct 03, 2003

NASA: Maybe a Year Before Next Shuttle Flight

Mid-September New Target Date

Suddenly concerned in public that perhaps some corrosion on Atlantis might have gone unnoticed, reports are coming from NASA that the next Shuttle mission could be launched no earlier than mid-September, 2004.

NASA spokesman James Hartsfield said that such problems were discovered and fixed on Discovery and Endeavour.

The last 'heavy' maintenance Atlantis received (other than during the unrelated flat-panel cockpit upgrade three+ years ago) was in 1997~98, when Hartsfield said the agency admitted it may not have checked deeply enough for troubles possibly lurking under the nose cap of Atlantis. "The reason we are discussing this is to understand whether removing the nose cap and inspecting it is something we need to do to make sure Atlantis’s thermal protection system is safe for flight," Hartsfield said.

Why Discovery or Endeavour couldn't be ready sooner -- perhaps the next missions are so specific that particular equipment couldn't be transfered -- was not discussed.

Of course, if the launch date slips much past the end of September, the shorter days (NASA recently amended its flight rules to allow only daylight shuttle launches) and colder nights (ice, O-ring shrinkage) could delay a launch until the Spring of 2005. Meanwhile, the ISS crew keeps it together, performing construction and experiments on a greatly-amended schedule, relying on the Russian Soyuz program to keep the Station going, and manned.

FMI: www.nasa.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC