AD: Airbus Defense And Space S.A. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Mar 06, 2020

AD: Airbus Defense And Space S.A. Airplanes

AD NUMBER: 2020-03-18

PRODUCT: Airbus Defense and Space S.A. Model C-212-CB, C-212-CC, C-212-CD, C212-CE, and C-212-DF airplanes.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-19-08 and AD 2018-19- 02, which applied to Airbus Defense and Space S.A. Model C-212-CB, C-212-CC, C-212-CD, C212-CE, and C-212-DF airplanes.

AD 2018-19-02 required repetitive inspections of the rudder pedal control system support box and shaft and applicable corrective actions; accomplishing those actions terminated the requirements of AD 2017-19-08. T

his AD continues to require repetitive inspections and applicable corrective actions; and also requires a modification of the rudder pedal adjustment system; as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference.

This AD was prompted by a determination that a modification must be done in order to address the unsafe condition.

DATES: This AD is effective April 2, 2020.

COST: The FAA estimates that this AD affects 37 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Retained Actions from AD 2017-19-08 and AD 2018-19-02:
    • 8 work-hours × $85 per hour = $680 per airplane.
  • New Actions:
    • Labor: 9 work-hours × $85 per hour = $765
    • Parts: $20,000.
    • Cost per Airplane: $20,765.
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC