First P-8A Poseidon Moves From Final Assembly To Preflight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Aug 14, 2008

First P-8A Poseidon Moves From Final Assembly To Preflight

Scheduled To Enter Service With US Navy In 2013

Boeing Integrated Defense Systems (IDS) and Boeing Commercial Airplanes (BCA) employees gathered this week in Renton, WA to celebrate the completion of final assembly on the first P-8A Poseidon for the US Navy and its move to preflight work.

IDS and BCA are building the P-8A, a military derivative of the 737-800, on a third final assembly production line in Renton, home to commercial 737 production.

"We're proud to have completed final assembly on the first P-8A Poseidon," said Mo Yahyavi, vice president and P-8 program manager for BCA. "Our objective on the P-8 program is to provide the Navy with the world's most advanced maritime patrol and reconnaissance aircraft. BCA and IDS working together as one team will be able to do just that."

IDS will now focus on calibrating the flight-test instrumentation onboard the aircraft before moving it to Boeing Field in Seattle early next year for systems integration and additional testing.

"Program milestones, both big and small, are met daily thanks to our outstanding Poseidon team," said Bob Feldmann, vice president and P-8 program manager. "Since the start of final assembly in late March, the team has met all assembly milestones, including wing-to-body-join and start of the moving line in May, completion of full-power testing and engine installation in June and, most recently, engine run."

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013.

FMI: www.boeing.com/ids, www.navy.mil

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC