Brazilian AF To Upgrade Inspection Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Apr 08, 2018

Brazilian AF To Upgrade Inspection Aircraft

New Panels To Be Installed In Four Hawker 800XP Jets

The Brazilian Air Force Flight Inspection Group (GEIV) will be upgrading its fleet of Hawker 800XP aircraft with Rockwell Collins’ Pro Line 21 avionics suite that will bring them into compliance with upcoming airspace mandate requirements. This marks the first Pro Line 21 retrofit to be installed on a Hawker 800XP in Latin America.

“Pro Line 21 provides enhanced situational awareness and delivers a whole new flight experience for pilots,” said Marcelo Vaz, managing director for Rockwell Collins in Brazil. “The upgrade will also bring the Brazilian Air Force improved reliability over legacy avionics with lower maintenance costs over the long-term.”

The Pro Line 21 retrofit replaces legacy Cathode Ray Tube (CRT) displays with four large, configurable 10 x 8-inch liquid crystal displays (LCDs) that are capable of displaying high-resolution electronic charts, graphical weather, enhanced navigation maps, enhanced vision and other mission-specific options.

The four Hawker 800XP aircraft being upgraded are used by the GEIV to inspect and calibrate the air navigation aid, approach and landing equipment, as well as the high precision air navigation procedures. This helps provide safe operation to all aircraft flying within Brazilian air space during all flight phases, especially during adverse meteorological conditions. Existing components on the aircraft used for its mission, such as the flight inspection deck and sensors, will be fully integrated to operate within the new Pro Line 21 system.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC