Oshkosh 2021 NOTAM Includes Important Changes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Apr 23, 2021

Oshkosh 2021 NOTAM Includes Important Changes

Note: KOSH Air Traffic Procedures Are Required Reading For All Aviators Flying To AirVenture

There are several important FAA-approved changes in the EAA AirVenture Oshkosh 2021 Notice to Airmen (NOTAM), featuring arrival and departure procedures for the Experimental Aircraft Association's 68th fly-in convention July 26-August 1 at Wittman Regional Airport in Oshkosh.

These changes are based on pilot feedback and FAA review of arrival procedure recommendations. 

The NOTAM, which is in effect from noon CDT on Thursday, July 22, until 8 p.m. CDT on Sunday, August 1, outlines procedures for the many types of aircraft that fly to Oshkosh for the event, as well as aircraft that land at nearby airports. The NOTAM was designed by the FAA to assist pilots in their EAA AirVenture flight planning.

"With AirVenture on hiatus last year, it is more crucial than ever to thoroughly read and understand the 2021 AirVenture NOTAM to ensure safe operations on arrival and departure for this year's event," said Sean Elliott, EAA's vice president of advocacy and safety.

"We also urge all pilots to log appropriate cross country time prior to their trip to Oshkosh so they have the proficiency and confidence to fly safely in conjunction with a thorough knowledge of this year's NOTAM."

Some of the 2021 changes include:

  • There are new ATC-assignable transition points approaching Oshkosh from the west that will ease holding and congestion. These points are at Endeavor Bridge, Puckaway Lake, and Green Lake. They will be announced on the arrival ATIS when ATC put them into use at times of highest traffic flows.
  • Different start and ending dates for the NOTAM.
  • The temporary Runway 18L/36R at Oshkosh (KOSH) has been reconstructed and is now 60 feet wide.
  • Two VORs have been decommissioned (FAH and IKK).
  • Numerous editorial changes

EAA is also hosting a webinar on June 23 at 7 p.m. regarding flying to AirVenture 2021 and changes in this year's NOTAM. Pilots are encouraged to participate in that webinar to build their knowledge prior to their flights to Oshkosh.

FMI: Pilots can download a digital version of the NOTAM at www.EAA.org/NOTAM

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC