Certifiable Predator B Fuselage Integration Begins | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jul 11, 2016

Certifiable Predator B Fuselage Integration Begins

Marks First Step Of Physical Production; Flight Testing Planned For Late 2016

General Atomics Aeronautical Systems, Inc. (GA-ASI), a leading manufacturer of Remotely Piloted Aircraft (RPA) systems, radars, and electro-optic and related mission systems solutions, today announced that fuselage integration of its new Certifiable Predator B (CPB) RPA system in now underway.

“The start of fuselage integration for the CPB aircraft represents a significant milestone in our progression towards building a certifiable platform,” said Dave R. Alexander, president, Aircraft Systems, GA-ASI. “CPB will provide a next-generation capability, integrating enhanced safety and reliability systems that will enable RPA flight within civilian airspace, ushering in a new era in unmanned aviation.”

During fuselage integration, numerous components will be installed, including brackets and mounting hardware, electrical cables, fuel systems, oil and cooling systems, landing gear,  avionics hardware and software, and a propulsion system.

The next major phase of the aircraft assembly effort consists of wings and tails integration, which is planned for summer 2016, to be followed by complete electrical factory testing.

Upon successfully completing all installations and inspections, the aircraft will undergo power checks, fuel checks, and a complete system check. Lastly, ground verification testing will be conducted prior to first flight of the CPB prototype aircraft. Flight testing is planned for late 2016.

(Source: GA-ASI news release. Image from file)

FMI: www.ga-asi.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC