Certifiable Predator B Fuselage Integration Begins | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jul 11, 2016

Certifiable Predator B Fuselage Integration Begins

Marks First Step Of Physical Production; Flight Testing Planned For Late 2016

General Atomics Aeronautical Systems, Inc. (GA-ASI), a leading manufacturer of Remotely Piloted Aircraft (RPA) systems, radars, and electro-optic and related mission systems solutions, today announced that fuselage integration of its new Certifiable Predator B (CPB) RPA system in now underway.

“The start of fuselage integration for the CPB aircraft represents a significant milestone in our progression towards building a certifiable platform,” said Dave R. Alexander, president, Aircraft Systems, GA-ASI. “CPB will provide a next-generation capability, integrating enhanced safety and reliability systems that will enable RPA flight within civilian airspace, ushering in a new era in unmanned aviation.”

During fuselage integration, numerous components will be installed, including brackets and mounting hardware, electrical cables, fuel systems, oil and cooling systems, landing gear,  avionics hardware and software, and a propulsion system.

The next major phase of the aircraft assembly effort consists of wings and tails integration, which is planned for summer 2016, to be followed by complete electrical factory testing.

Upon successfully completing all installations and inspections, the aircraft will undergo power checks, fuel checks, and a complete system check. Lastly, ground verification testing will be conducted prior to first flight of the CPB prototype aircraft. Flight testing is planned for late 2016.

(Source: GA-ASI news release. Image from file)

FMI: www.ga-asi.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC