Australian Defense Minister Slams Boeing Over Wedgetail Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jun 30, 2006

Australian Defense Minister Slams Boeing Over Wedgetail Project

"Very Disappointed" With Delays

Australia's defense minister says he's tired of waiting for Boeing to deliver the six Airborne Early Warning and Control Aircraft the manufacturer is building for that country's military.

Bloomberg reports in a joint press conference with US Defense Secretary Donald Rumsfeld this week, Brendan Nelson said his country is "very disappointed" with significant delays in the program.

"I think Boeing has let the Australian government down, and I think they've let themselves down," Nelson said.

Nelson also said he's met with the head of Boeing's defense department, Jim Albaugh... and, he says, he gave Albaugh a message: Nelson intends to make "damn sure" Boeing delivers on their end of the bargain.

Despite his harsh words, however, Nelson was careful to note that he, and other Australian defense officials, are "confident" that despite the 18-month delay, they'll eventually get the aircraft coming to them.

The planes in question are part of the "Wedgetail" program, which uses Boeing's next-generation 737 commercial plane as the foundation for an early-warning radar platform. Boeing is also building a version of the plane for Turkey -- it's called the "Peace Eagle" there -- and that program has suffered from similar delays.

Boeing announced Thursday that it will take somewhere between a $300 million and $500 million pre-tax hit this fiscal quarter for the delays... revenue that Boeing's defense side -- currently a loss leader, compared to Boeing's profitable commercial operation -- really can't afford to lose.

FMI: www.boeing.com/defense-space/infoelect/wedgetail-737/

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC