Hurricane Nicole Delays NASA Resupply Launch to Space Station | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Oct 13, 2016

Hurricane Nicole Delays NASA Resupply Launch to Space Station

Storm Is Threatening Bermuda Where A Critical Tracking Station Is Located

NASA and its partner Orbital ATK have postponed the launch of the company’s next commercial resupply mission to the International Space Station to no earlier than Sunday, Oct. 16, as the agency prepares for Tropical Storm Nicole at its tracking site in Bermuda.

A Sunday launch would occur at 8:03 p.m. EDT from NASA’s Wallops Flight Facility in Virginia, with a five-minute window. The launch will air live on NASA Television and the agency’s website beginning at 7 p.m. The date of the arrival of the Orbital ATK Cygnus spacecraft to the space station is to be determined.

As the spacecraft’s trajectory takes it from Wallops and past Bermuda on its flight into orbit, the Bermuda tracking station provides downrange tracking, telemetry and flight termination support. Tropical Storm Nicole is expected to reach Bermuda as a hurricane Thursday, Oct. 13.

“The tracking station at Bermuda is required to conduct the Antares launch from Wallops,” said Steven Kremer, chief of the Wallops Range and Mission Management Office. “The ability to support a launch will depend on the impact the storm has on not only our systems, but also the overall Bermuda infrastructure.”

After the storm system has passed Bermuda, the Wallops team will conduct a damage assessment, perform mission readiness testing, and bring the site back up to operational status.

(Image provided with NASA news release)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC