Hurricane Nicole Delays NASA Resupply Launch to Space Station | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Oct 13, 2016

Hurricane Nicole Delays NASA Resupply Launch to Space Station

Storm Is Threatening Bermuda Where A Critical Tracking Station Is Located

NASA and its partner Orbital ATK have postponed the launch of the company’s next commercial resupply mission to the International Space Station to no earlier than Sunday, Oct. 16, as the agency prepares for Tropical Storm Nicole at its tracking site in Bermuda.

A Sunday launch would occur at 8:03 p.m. EDT from NASA’s Wallops Flight Facility in Virginia, with a five-minute window. The launch will air live on NASA Television and the agency’s website beginning at 7 p.m. The date of the arrival of the Orbital ATK Cygnus spacecraft to the space station is to be determined.

As the spacecraft’s trajectory takes it from Wallops and past Bermuda on its flight into orbit, the Bermuda tracking station provides downrange tracking, telemetry and flight termination support. Tropical Storm Nicole is expected to reach Bermuda as a hurricane Thursday, Oct. 13.

“The tracking station at Bermuda is required to conduct the Antares launch from Wallops,” said Steven Kremer, chief of the Wallops Range and Mission Management Office. “The ability to support a launch will depend on the impact the storm has on not only our systems, but also the overall Bermuda infrastructure.”

After the storm system has passed Bermuda, the Wallops team will conduct a damage assessment, perform mission readiness testing, and bring the site back up to operational status.

(Image provided with NASA news release)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC