Weather Woes Push Dawn Launch To July 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jul 05, 2007

Weather Woes Push Dawn Launch To July 8

And Even Then, It Ain't Lookin' Good

More weather woes for NASA, this time affecting its delay-plagued Dawn spacecraft. A lightning advisory near Kennedy Space Center Thursday morning forced the space agency to scrub its plans to begin fueling the second-stage of the probe's United Launch Alliance Delta II booster rocket.

The delay in fueling pushes the launch date for Dawn to July 8, one day later than previously scheduled. NASA will again try to fuel the second stage Thursday afternoon; if the weather remains a concern, fueling will be performed Friday.

Lightning wasn't the only concern at the Cape. Also Thursday morning, the temperature within the fairing caused the required temperature of the second stage to be too warm for fueling to begin. The fairing temperature is being lowered by 10 degrees so that oxidizer loading can begin Thursday afternoon, if weather is acceptable.

The launch window on Sunday, July 8, extends from 4:04 to 4:33 pm EDT... but the chance of not meeting the launch weather criteria on Sunday is 60 percent, according to NASA.

These latest delays are but the latest to strike the problematic Dawn spacecraft, which NASA hopes will eventually be sent into the heavens to study the twin asteroids Ceres and Vesta, between Mars and Jupiter. Cancelled by the space agency due to cost overruns in early 2006, before being reinstated one month later, Dawn's planned June launch date was already moved off once, after a crane used to stack segments of the Delta II booster broke down.

A worker's wrench also fell on the spacecraft's solar panel during a procedure to prepare the spacecraft for spin-balance testing, though it did not damage any cells.

FMI: http://dawn.jpl.nasa.gov/

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC