Embraer Reports That Legacy 450, 500 Programs On Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, May 20, 2011

Embraer Reports That Legacy 450, 500 Programs On Schedule

Over 500 Engineers Are Engaged In The Programs

Embraer’s Legacy 450 and Legacy 500 programs are well underway, the company said this week at EBACE, and are moving steadily through their Detailed Design and Certification Phase (DDCP) in the hands of more than 500 of the company’s engineers.


Legacy 500

A new full-size Legacy 500 mock-up, built by Austria’s List Components & Furniture GmbH and consisting of the cockpit, main cabin and aft baggage compartment, is now operational. The cockpit and cabin interior utilize approximately 90% of the current aircraft production parts manufactured by Embraer and the program suppliers.

The Critical Design Review (CDR) has also been completed, and the first and second prototypes of the Legacy 500 are being assembled at the Company’s headquarters in São José dos Campos, Brazil.


Legacy 450/500 Cockpit

“It is amazing what has been accomplished by the Legacy 450 and Legacy 500 team in the past months. Numerous refinements to the cabin styling and comfort have been implemented.  We have also been dedicating a lot of attention to the robustness of the design and to product maturity. Our priority is to deliver to our customers a best-in-class airplane, with outstanding comfort, performance, reliability and maintenance characteristics,” said Maurício Almeida, Vice President, Programs – Embraer Executive Jets.

Honeywell is performing flight tests of its modern HTF7500E engines that incorporate the latest technologies for meeting performance requirements with improved fuel consumption, ease of maintenance, low operating costs, and reduced noise and emissions.


Legacy 450/500

Numerous systems test benches are operational and dedicated to perform integration and maturity tests. “Our Iron Bird has performed almost 1,000 hours of tests, in order to guarantee the mature integration of all aircraft systems, with special attention to the fly-by-wire flight control system,”  said Ricardo Maltez, Legacy 450 and Legacy 500 Program Manager. “Avionics testing at both Embraer and Rockwell Collins are on schedule, meeting our design goals.

”The first flight of the Legacy 500 is on schedule to be completed during the second half of 2011. Certification discussions are underway with the Brazilian civil aviation authority (ANAC), the FAA, and the EASA.

FMI: www.embraer.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC