F-35B Completes First Airborne Engine Start Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Sep 06, 2012

F-35B Completes First Airborne Engine Start Tests

BF-2 Made 27 Successful Air Starts Last Month

The F-35 integrated test force announced the completion of a major prerequisite test for in-flight performance on the short take-off and vertical landing variant of the F-35 Lightning II Joint Strike Fighter September 4.

BF-2 completed the first air starts, which test the ability of the F-35's propulsion system to restart during flight. Verifying the restart capability of the propulsion system is part of the initial flight test program for the F-35 and a prerequisite for high angle-of-attack testing, scheduled to start next year.
 
"High alpha, or angle-of-attack tests, are important for us to fully evaluate the aircraft's handling characteristics and warfighting capability," said Marine Corps test pilot Lt. Col. Matthew Kelly. "Maximizing the performance of the airplane around the very slow edges of the flight envelope is probably some of the most challenging testing we will conduct. After we get through it, we'll know a lot more about how this aircraft will perform during combat within visual range."
 
Using multiple restart methods during the tests, BF-2 successfully completed a series of 27 air starts at various altitudes August 15. To execute air start testing, the F-35 Integrated Test Force (ITF) at Naval Air Station Patuxent River in Maryland ferried BF-2 and an F/A-18 chase aircraft from Air Test and Evaluation Squadron (VX) 23 to the F-35A testing facility at Edwards AFB.

"At Edwards, we have a unique testing range, which provides ideal and controlled conditions for completing air start testing. The Edwards range is comprised of 20,000 square miles of airspace, and has 65 linear miles of useable landing area on Rogers and Rosamond Dry Lakes, if required during engine out testing," said Lt. Col. George N. Schwartz, commander of the 461st Flight Test Squadron and government site director. "In addition, we've recently completed air start testing on the F-35A, so we're able to share some of our expertise with the Pax team as well."

The core of the F-35B's propulsion system is the F135 engine, capable of more than 40,000 pounds of thrust. "The F135 continues to power a successful flight test program," said Roy Hauck, Pratt & Whitney site lead at the F-35 Patuxent River ITF. "The aircraft and its integrated systems demonstrated intentional flameout and successful recovery scenarios during air start flight tests, and BF-2 and the team did a great job."
 
A team of approximately 60 ITF and VX-23 personnel provided engineering and maintenance requirements for the events. The detachment to Edwards from NAS Patuxent River overlapped with a busy summer flight testing schedule.
 
"In the past two months, we've sent detachments to Edwards and Lakehurst (NJ) and maintained a full-tempo test schedule here," said Navy Capt. Erik Etz, director of test for F-35 naval variants at NAS Patuxent River. "The team of military, government and industry personnel rallied to make all the events happen, and they can be proud of their accomplishments."

(F-35B images from file)

FMI: www.navy.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC