Dassault Ends Falcon 5X Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Dec 13, 2017

Dassault Ends Falcon 5X Program

Cites Issues With Delivery Of Engines, Will Start Development Of A New Aircraft

Dassault Aviation has initiated the termination process of the Silvercrest contract leading to the end of the Falcon 5X program, and announces the launch of a new Falcon program with an entry into service in 2022.

The delivery of compliant Silvercrest engines was originally planned for the end of 2013 in accordance with the Falcon 5X flight test schedule. But Safran was plagued with recurrent technical issues during the program development.

In 2015 and 2016, major technical issues led Safran to announce a new schedule leading to the delivery of engines for the Falcon 5X flight article by the end of 2017. Consequently, Dassault Aviation had to postpone the entry into service of the Falcon 5X from 2017 to 2020,  a 3-year delay. This slippage has caused customers' concerns and order cancellations, including 12 in 2016.

Equipped with a preliminary version of the engine, not compliant with the specifications, the Falcon 5X performed its maiden flight, on July 5, 2017, and started a preliminary flight test campaign, limited by engines capacity. The Falcon 5X flight behavior met all the expectations.

In the fall of 2017, Safran experienced issues with the high pressure compressor and informed Dassault Aviation of an additional delay and new performance shortfall, making the 2020 entry into service of the aircraft impossible.

Considering the magnitude of the risks involved both on the technical and schedule aspects of the Silvercrest program, Dassault Aviation has begun the termination process of the Silvercrest contract leading to the end of the Falcon 5X program and plans to start negotiations with Safran.

"There is still a strong market need for a brand new long range aircraft with a very large cabin," said Dassault Aviation CEO Eric Trappier, "so I have decided to launch a new Falcon project powered by Pratt & Whitney Canada engines, featuring the same cross section as the Falcon 5X, a range of 5,500 nm, and scheduled to enter into service in 2022."

(Source: Dassault Aviation news release. Images from file)

FMI: www.dassault-aviation.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC