Setting Sail For ESA Spaceplane Recovery | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 10, 2014

Setting Sail For ESA Spaceplane Recovery

Recovery Vessel Traveling From The Mediterranean To The Pacific Ocean

The Nos Aries received a special send-off at the 54th International boat show in Genoa as it began its long journey across the Mediterranean Sea and the Atlantic.

A team of mission engineers will board in Panama and from there sail through the Panama Canal and into the Pacific.

First, they will check the ship’s antenna and telemetry receivers are working properly after the long journey. The autotracking of the antenna that will pick up the signals from the Intermediate eXperimental Vehicle on its flight back to Earth will be checked by following low-orbit satellites.
 
Although the team have already practised the tricky manoeuvre of lifting IXV out of the ocean, they will continue to hone their skills under a wide range of conditions.
 
Nos Aries , the Mission Control Centre in Turin and ESA’s Spaceport in Kourou, French Guiana will be linked up via Inmarsat satellite for IXV mission simulations using voice, data and video. The crew will also take part in a dress rehearsal of the launch, three days before the actual liftoff.
 
The ship will reach its destination four days before the flight, slightly north of the equator, on a circle 25 km from the target landing spot. This distance guarantees the safety of the ship while allowing maximum telemetry reception and rapid access to IXV after splashdown.
 
On flight day, the ship will release weather balloons to check the wind conditions over the Pacific to provide information on IXV’s descent path. If sea conditions allow the launch to go ahead, Nos Aries will receive the readings from IXV’s 300 sensors during descent and then pick up the beacon signals to pinpoint the craft in the water.
 
Divers in speedboats will approach the floating craft and then stand back as sniffer devices check for residual propellant fumes. On the all-clear, the recovery cranes will carefully hoist IXV to safety before the fuel tank is cleaned out for the journey home to Europe.
 
Lofted by a Vega rocket, IXV will test the technologies and critical systems for Europe’s future automated reentry vehicles returning from low orbit.

(Image provided by the European Space Agency)

FMI: www.esa.int

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC