NASA Gears Up For Next Set Of Engine Tests for Space Launch System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Apr 21, 2014

NASA Gears Up For Next Set Of Engine Tests for Space Launch System

New Launch Vehicle Engine Actually Has A Lot Of Time In Space

Formerly known as the space shuttle main engine, the RS-25 accumulated over 1 million seconds (that’s about 280 hours) of hot fire experience during 135 missions and numerous related engine tests.

The RS-25 engine that will power NASA's new rocket, the Space Launch System (SLS), off the launch pad and on journeys to an asteroid and Mars is getting ready for the test stand. And it is packing a big punch.

Engineers at NASA's Stennis Space Center near Bay St. Louis, MS, are now focusing their attention on preparing the RS-25 engine after completing testing of the J-2X engine April 10. Four RS-25 engines, previously known as space shuttle main engines, will muscle the core stage of SLS for each of its missions. Towering more than 200 feet tall with a diameter of 27.6 feet, the core stage will store cryogenic liquid hydrogen and liquid oxygen that will feed the vehicle’s RS-25s.

Modifications to the engines, like higher thrust levels, were needed on the proven workhorse to prepare them for the SLS. To accommodate a higher thrust level, the number of engines was increased from three, used during the shuttle era, to four. The power level also was increased for each engine.

Engines on the shuttle ran at 491,000 pounds vacuum thrust (104.5-percent of rated power level). After analyzing temperature and other factors on the engine, the power level was increased for SLS to 512,000 pounds vacuum thrust (109 percent of rated power level).
Modifications also have been made to the A-1 test stand at Stennis to prepare for the RS-25's first hot-fire test.

(Image provided by Aerojet Rocketdyne)

FMI: www.nasa.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC