Mission System Flight Tests Completed For WACS Block 40/45 Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Sep 14, 2008

Mission System Flight Tests Completed For WACS Block 40/45 Upgrade

Boeing tells ANN that it has completed mission system flight testing for Block 40/45, the largest upgrade in the history of the U.S. E-3 Airborne Warning and Control System (AWACS) fleet. During a 15-month period from April 2007 to July 2008, Boeing and the Air Force's Joint Test Force flew missions aboard Test System 3, an AWACS test aircraft, to complete the System Design and Development program.

"Test data indicate the Block 40/45 system meets or exceeds all its key performance parameters and technical performance requirements," said Stu Oliason, 40/45 System Design and Development program manager for Boeing.

"The success of this flight-test program is a tribute to the hard work and dedication of hundreds of 40/45 employees. We're all very excited about bringing this new capability to the warfighter," Oliason added.

Under the Block 40/45 program, the aircraft's legacy mainframe computer has been replaced with an open system architecture using network servers in a user-friendly operating environment. The vastly improved computing power helps automate what is currently a manually intensive workload for the AWACS operators.

A multisource integration capability automates the process of detecting and identifying targets to provide a single-target/single-track resolution. Outgoing tasking messages are automatically prioritized via a data link infrastructure. Features are displayed to operators on the Primary AWACS Display in a user-friendly, intuitive manner. The numerous buttons and switches around the current operator console have been replaced with point-and-click simplicity and a display featuring drop-down menus and rapid access to all required information. This functionality shortens the time required to execute either combat or search-and-rescue missions.

The cumulative benefit of the Block 40/45 upgrade is to increase overall mission effectiveness for AWACS operators in the 21st-century battlespace, while boosting the reliability of the mission system and lowering life-cycle costs. The baseline capability is designed to allow future upgrades.

The Air Force is expected to make a decision on the next step -- a Block 40/45 production contract -- by the end of this year.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC