Third Falcon 8X Joins Flight Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, May 20, 2015

Third Falcon 8X Joins Flight Test Program

Flight Envelope Now Fully Open For The Ultra Long Range Trijet

The third and final Falcon 8X test aircraft has taken to the skies as the flight test campaign for the new ultra long range trijet moves into high gear.

Falcon 8X s/n 03 took off from Dassault Aviation's Bordeaux-Mérignac facility on Monday, May 11 at 2.00 p.m. local time with test pilots, Etienne Faurdessus and Damien Brault at the controls. The flight plan was similar to that of s/n 02, which joined the test campaign on April 2. 

In June, s/n 03 will be ferried to the Falcon completion facility in Little Rock, Arkansas, where it will be fitted out with a full cabin and tested for cabin comfort and sound level.

"We are very pleased with the way the Falcon 8X flight test program is progressing," said Eric Trappier, Chairman and CEO Dassault Aviation. "All three aircraft have exhibited flawless handling and responded exactly as intended when designed."

The first two test aircraft are both well into the certification campaign at the Dassault flight test center at Istres, near Marseille, France.

S/n 01 recently finished opening the flight envelope, including high speed performance testing at Mach 0.96 (beyond its MMO), maximum ceiling of 51,000 ft and full range of angles of attack. The aircraft also tested out different weight configurations, including MTOW, and underwent a high energy brake test campaign.

Meanwhile, s/n 02 has begun its test routine, which is aimed at verifying key performance parameters such as fuel consumption and landing/takeoff distance. Completion of certification performance trials is anticipated this summer.

Altogether, the three test aircraft have completed 50 sorties as of mid-May. The full program will total some 200 flights and 500 flight hours through final EASA and FAA certification, which is anticipated in mid-2016.

Aircraft production is also well advanced. Eight aircraft are currently in final assembly and 15 other units are at various stages of production.

(Image provided by Dassault)

FMI: www.dassaultfalcon.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC