Forensic Testing Being Done On Endeavour Load Control Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, May 05, 2011

Forensic Testing Being Done On Endeavour Load Control Assembly

New LCA Box Has Been Installed Aboard The Orbiter

Technicians at the NASA Shuttle Logistic Depot in Cape Canaveral, FL, are doing additional forensic engineering testing on a faulty power distribution box, called a Load Control Assembly 2 (LCA-2). It was removed Tuesday morning from the aft compartment of space shuttle Endeavour on Launch Pad 39A at NASA?s Kennedy Space Center.

Technicians are trying to determine what caused the power box to fail. Initial testing shows a driver (circuit) inside the LCA-2 shorted out. The LCA-2 feeds power to heaters on the fuel line for Endeavour's auxiliary power unit-1 (APU-1). Initially, when the shorted out driver was replaced, the LCA-2 appeared to worked as designed.

Technicians are performing additional failure analysis on the driver to confirm whether the short experienced by the system came from inside or outside the LCA-2. Depending on the results, additional testing of the box may be required. On Launch Pad 39A, a new LCA-2 box was installed into Endeavour Wednesday morning, and technicians are preparing to retest the system before Endeavour's next launch attempt is scheduled. Currently, Endeavour's no earlier than launch date remains May 10.

The APU-1 fuel line heaters did not work on April 29, prompting the launch team to scrub the Endeavour's first launch attempt for the STS-134 mission to the International Space Station.

FMI: www.nasa.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC