Breaking News: Ares 1-X Test Launch Scrubbed Due To Weather | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 27, 2009

Breaking News: Ares 1-X Test Launch Scrubbed Due To Weather

Will Attempt Wednesday Launch

ANN Realtime Update: 10.27.2009 1200 EDT:  The Ares I-X launch team is preparing for a 24-hour turnaround, targeting 0800 on Wednesday as liftoff time for the Ares I-X flight test vehicle.

Tuesday's attempt was plagued by weather issues, even though the vehicle itself was ready to fly. After multiple attempts to reset to new launch times during the 4-hour window, the final scrub came when the weather did not improve as the end of the window neared. Wednesday's weather improves somewhat, with a 40 percent "no-go."

Wednesday's attempt will have the same 4-hour window that ends at noon.

Original Story: As hard as they tried, the weather would not cooperate with the Ares I-X launch team. They have called a scrub for today and will make a determination regarding an attempt for tomorrow.

The countdown held at T-4 minutes for over two hours, delayed first by a cargo ship in the launch box, and later by increasing winds. When the ship was first  seen in the launch range, a launch controller said "I don't want to see this delayed until weather becomes a problem."

But weather became a problem. While clouds and a few showers moved in over the launch complex, it was eventually sustained winds of about 20 knots which eventually caused NASA to call a scrub.

Launch Test Director Jeff Spaulding instructed the launch team to begin safing the vehicle and set up for a recycle of the countdown.

"We had some opportunities, but just couldn't get there," Spaulding said to the team. "Weather didn't cooperate."

The Ares 1-X team will make a determination later today about trying again to launch on Wednesday.

FMI: www.nasa.gov

 


Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC