AD: International Aero Engines AG Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, May 29, 2015

AD: International Aero Engines AG Turbofan Engines

AD NUMBER: 2015-10-04

PRODUCT: All International Aero Engines AG (IAE) V2500-A1, V2525-D5, and V2528-D5 turbofan engines, and certain serial numbers (S/Ns) of IAE V2522-A5, V2524-A5, V2527-A5, V2527E-A5, V2527M-A5, V2530-A5, and V2533-A5 turbofan engines.

ACTION: Final Rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2012-09-09 for the products listed above.

AD 2012-09-09 required cleaning, eddy current inspection (ECI) or fluorescent penetrant inspection (FPI), and initial and repetitive ultrasonic inspections (USIs) of certain high-pressure compressor (HPC) stage 3 to 8 drums, as well as replacement of the drum attachment nuts.

This new AD expands the affected population for initial and repetitive USIs of the HPC stage 3 to 8 drum, revises the inspection intervals, requires performing ECI or FPI, requires removal of the affected attachment nuts and any HPC stage 3 to 8 drum found cracked, and adds a mandatory terminating action.

This AD was prompted by the discovery that additional attachment nuts for certain HPC stage 3 to 8 drums are affected. The FAA is issuing this AD to prevent failure of the HPC stage 3 to 8 drum, which could result in uncontained drum failure, damage to the engine, and damage to the airplane.

DATES: This AD is effective July 1, 2015.

FMI: AD

 


Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC