Atlantis Gets 'Dinged' On Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, May 13, 2009

Atlantis Gets 'Dinged' On Launch

21 Inch 'Ding' Reportedly Took Place 104 Seconds Into Lift-Off

So far, so good... unless you count the fact that Atlantis took a bit of a hit less than two minutes into Monday's launch, while starting its mission to the Hubble Space Telescope.

Atlantis’ crew completed a planned survey of the shuttle heat shielding Tuesday, noting a few dings in tiles that experts will continue to analyze. Flight Director Tony Ceccacci said that upon an initial look, damage found during the inspection appeared to be minor and likely not a concern, but he said experts would analyze it as is normal to be certain the shuttle’s heat shielding is in good shape. The damage included small dings along an area of about 21 inches spanning four of the shuttle’s thermal tiles located on the starboard side of the spacecraft where the wing blends into the forward fuselage.

Throughout the day, the crew prepared for Wednesday’s rendezvous with the Hubble Space Telescope. The day's activities included the check out of tools they will use during the rendezvous with the telescope. The rendezvous is scheduled to occur at 7:41 a.m. Wednesday (OK, Space Geeks... raise your hand if you have your alarm set to watch this... as I try to type this with one hand aloft...)

The crew members also checked out spacesuits they will use during the mission’s five scheduled spacewalks.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC