EPS Diesel Pre-Certification Evaluation Shows Promising Results | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jul 29, 2017

EPS Diesel Pre-Certification Evaluation Shows Promising Results

Has Undergone High Altitude And High Temperature Testing

By: Gene Yarbrough

Michael Fuchs presented preliminary testing results for the EPS 4.3 liter diesel engine in development during a media briefing at AirVenture.

The engine, an 8 cylinder 180 degree horizontally opposed mill, targeting the O-540/550 family has showed good performance in testing aimed at certification. The Graflight V-8 engine employs an electronic control system designed and manufactured by industry leader Bosch General Aviation Technology to dramatically reduce pilot workload and ensure efficiency and ease of operation. The engine is controlled with a single power lever, leaving traditional pilot chores like propeller pitch, fuel mixture and controlling engine temperature to the computer, reducing the risk of pilot error.

The engine is designed with extremely rugged technologies, like steel pistons and CGI iron crankcases that provide superior strength and durability over aluminum without sacrificing weight. This reduces maintenance costs significantly by increasing the targeted Time Between Overhauls (TBO) to 3,000 hours, a 50 to 100 percent increase over the industry’s current values of 1,500 to 2,000 hours.

The engine has undergone high altitude testing in Colorado and high temperature testing in Arizona, both efforts indicating operating in these extremes as expected with no adverse behaviors thus far. The engine is rated at 408 horsepower for takeoff and will maintain that output to 30,000 ft with an expected TBO of 3000 hrs.

Fuchs stated that although the development process is long and costly the company has funding in place to achieve their production certificate and enter production with first deliveries expected "soon" without committing to a firm date.

(Image from file)

FMI: eps.aero

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC