EPS Diesel Pre-Certification Evaluation Shows Promising Results | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jul 29, 2017

EPS Diesel Pre-Certification Evaluation Shows Promising Results

Has Undergone High Altitude And High Temperature Testing

By: Gene Yarbrough

Michael Fuchs presented preliminary testing results for the EPS 4.3 liter diesel engine in development during a media briefing at AirVenture.

The engine, an 8 cylinder 180 degree horizontally opposed mill, targeting the O-540/550 family has showed good performance in testing aimed at certification. The Graflight V-8 engine employs an electronic control system designed and manufactured by industry leader Bosch General Aviation Technology to dramatically reduce pilot workload and ensure efficiency and ease of operation. The engine is controlled with a single power lever, leaving traditional pilot chores like propeller pitch, fuel mixture and controlling engine temperature to the computer, reducing the risk of pilot error.

The engine is designed with extremely rugged technologies, like steel pistons and CGI iron crankcases that provide superior strength and durability over aluminum without sacrificing weight. This reduces maintenance costs significantly by increasing the targeted Time Between Overhauls (TBO) to 3,000 hours, a 50 to 100 percent increase over the industry’s current values of 1,500 to 2,000 hours.

The engine has undergone high altitude testing in Colorado and high temperature testing in Arizona, both efforts indicating operating in these extremes as expected with no adverse behaviors thus far. The engine is rated at 408 horsepower for takeoff and will maintain that output to 30,000 ft with an expected TBO of 3000 hrs.

Fuchs stated that although the development process is long and costly the company has funding in place to achieve their production certificate and enter production with first deliveries expected "soon" without committing to a firm date.

(Image from file)

FMI: eps.aero

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC