FAA To Approve New PSP Tower Site In January | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.07.24

Thu, Nov 15, 2007

FAA To Approve New PSP Tower Site In January

Construction Expected To Begin In 2010

Proponents of a new control tower for Palm Springs International Airport in California received some good news from the FAA Wednesday -- the agency plans to approve a site for the new tower in January.

But that doesn't mean a new tower for PSP is in the immediate future. Even with a site selected in early 2008, construction on the new facility won't start until 2010, reports KNBC-4. The tower would open after two years after that.

Still, that's better than nothing... and there's little disagreement the current tower is inadequate for the fast-growing airport.

"It's taking it up a notch, and the best part is, the FAA is fully funding it," PSP executive director Thomas Nolan said. "The existing tower was built in 1967 and it's time for modernization by building a tower with cutting-edge equipment and better visibility."

The new tower will be 157 feet tall -- over twice the height of the current 67-foot tower. Airport officials would prefer the tower be located at midfield, near the current facility, though that decision will come in January.

Palm Springs Communications Director Cindy Uken says the new tower is expected to give controllers better sight lines for ground operations at PSP, as well as more advanced equipment to monitor traffic in the airspace around the airport.

PSP is gaining popularity with commercial travelers. Through the first half of 2007, the airport saw a 4.5 percent increase in passenger traffic.

A total of 845,313 passengers arrived or departed the airport through that time, said Uken.

FMI: www.palmspringsairport.com/

Advertisement

More News

ANN's Daily Aero-Term (06.10.24): Known Traffic

Known Traffic With respect to ATC clearances, means aircraft whose altitude, position, and intentions are known to ATC.>[...]

ANN's Daily Aero-Linx (06.10.24)

Aero Linx: Aviation Suppliers Association (ASA) Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association,>[...]

ANN's Daily Aero-Term (06.11.24): Abeam

Abeam An aircraft is “abeam” a fix, point, or object when that fix, point, or object is approximately 90 degrees to the right or left of the aircraft track. Abeam indic>[...]

ANN's Daily Aero-Linx (06.11.24)

Aero Linx: The Air Charter Safety Alliance The group, called the Air Charter Safety Alliance, will raise awareness of illegal charter flights among potential customers, charter bro>[...]

Aero-News: Quote of the Day (06.11.24)

“For months, ALPA has been sounding the alarm on the ongoing efforts by some aircraft manufacturers to remove pilots from the flight deck and replace them with automation. To>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC