Boeing B-1 Upgraded With Fully Integrated Data Link Completes 1st Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Aug 14, 2009

Boeing B-1 Upgraded With Fully Integrated Data Link Completes 1st Flight

Contract Award Expected In 2010

Boeing said Thursday that a B-1 bomber upgraded with the Fully Integrated Data Link (FIDL)successfully completed the first flight late in July. This upgrade includes new processors, color displays and communications architecture, enhancing B-1 crews' situational awareness and communications capability. The U.S. Air Force 419th Test Squadron conducted the flight from Edwards Air Force Base, CA.

The objective of the FIDL development program is to enhance the B-1 bomber by integrating beyond line-of-sight and line-of-sight data links. The data links reduce crew workload by dynamically re-tasking missions, eliminating the need for steps such as manual entry of weapons data for targeting.

In addition to the cockpit upgrades, the modification also improves and more tightly integrates the aft crew stations by replacing displays and associated hardware that were installed during aircraft production in the early 1980s. Additional upgrades include new open-architecture processors, mass-storage capability and an Ethernet network to integrate the aircraft's systems.

Boeing personnel at Edwards Air Force Base have been modifying the test aircraft over the past year. B-1 program employees at Edwards, at the Boeing facility in Long Beach and in other locations developed and integrated the new system's hardware and software.

 

File Photo

"Our team worked closely with the Air Force and many other programs throughout Boeing as we performed independent reviews of product designs and gained valuable insight from employees performing similar development tasks," said Mahesh Reddy, Boeing B-1 program manager. "This cross-company teamwork led to our successful first flight, which brings us one step closer to completing this major B-1 upgrade for our customer."

Flight testing will continue through 2010. The Air Force is expected to award a contract in November 2010 for the production of FIDL installation kits for the service's entire B-1 fleet.

FMI: www.boeing.com, www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC