AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Mar 08, 2010

AD: Boeing

AD NUMBER: 2010-05-03

MANUFACTURER: The Boeing Company Model 747-100, 747- 100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400, 747-400D, 747-400F, 747SR, and 747SP Series Airplanes
SUBJECT: Airworthiness Directive 2010-05-03

SUMMARY: This AD requires one-time detailed and high frequency eddy current inspections for cracks in the wing and horizontal stabilizer side-of-body joints and the fuselage skin circumferential splices, and repair if necessary. This AD also requires, for certain airplanes, repetitive detailed inspections for cracks of the fuselage skin circumferential splices, and repair if necessary. This AD results from Boeing analysis indicating that the wing and horizontal stabilizer side-of-body joints, and the fuselage skin circumferential splices, are susceptible to fatigue cracking due to high cyclic loads on the airplane. We are issuing this AD to detect and correct fatigue cracking at multiple adjacent locations in the subject areas, which could connect to form large cracks and result in reduced structural integrity leading to rapid decompression and consequent loss of control of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/3CFB99CBB3D9983E862576DC00559B0E?OpenDocument

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC