New GA Terminal Coming To Greenville-Spartanburg Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.07.24

Wed, Mar 11, 2009

New GA Terminal Coming To Greenville-Spartanburg Airport

Former Building Damaged In 2007 Storm

For the better part of two decades, the Greenville-Spartanburg International Airport in South Carolina has been fighting an uphill image battle. For years, it was known as the Greenville-Spartanburg Jetport.

Around 1990, a coordinated effort was made to get the locals to call it by its FAA identifier, GSP... thought to be a more sophisticated-sounding name. Locals responded by joking it would more accurately be called "the Greenville-Spartanburg Propeller Port."

A more recent blow to the airport's image was dealt by a 2007 rainstorm, which collapsed the roof of the general aviation terminal. In what probably should have become a Jeff Foxworthy joke, Stevens Aviation, the field's FBO, was forced to move out of the unsafe building into... a trailer.

Things are finally looking up. The Spartanburg Herald-Journal reports the Greenville-Spartanburg Airport Commission Monday awarded a contract valued at $1.25 million dollars to JonScot General Contractors of Greenville for construction of a new, 5,000 square-foot GA terminal. It will even have some thoroughly modern touches, using mostly recycled materials in construction, and incorporating rainwater collectors, day lighting and a solar water heating system.

GSP Spokeswoman Rosylin Weston observes, "For some of our customers, this is their first impression of the Upstate and we want to make it a good one."

In addition to providing the airport with a facelift, the construction jobs will be welcome. Construction is expected to start by April 1, and be completed by year's end.

FMI: www.gspairport.com

Advertisement

More News

ANN's Daily Aero-Term (06.10.24): Known Traffic

Known Traffic With respect to ATC clearances, means aircraft whose altitude, position, and intentions are known to ATC.>[...]

ANN's Daily Aero-Linx (06.10.24)

Aero Linx: Aviation Suppliers Association (ASA) Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association,>[...]

ANN's Daily Aero-Term (06.11.24): Abeam

Abeam An aircraft is “abeam” a fix, point, or object when that fix, point, or object is approximately 90 degrees to the right or left of the aircraft track. Abeam indic>[...]

ANN's Daily Aero-Linx (06.11.24)

Aero Linx: The Air Charter Safety Alliance The group, called the Air Charter Safety Alliance, will raise awareness of illegal charter flights among potential customers, charter bro>[...]

Aero-News: Quote of the Day (06.11.24)

“For months, ALPA has been sounding the alarm on the ongoing efforts by some aircraft manufacturers to remove pilots from the flight deck and replace them with automation. To>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC