AD: Fokker Services B.V. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Tue, Mar 10, 2020

AD: Fokker Services B.V. Airplanes

AD NUMBER: 2020-04-12

PRODUCT: Certain Fokker Services B.V. Model F28 Mark 0070 and 0100 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directives (ADs) 2012-22-05 and 2018-19-03, which applied to certain Fokker Services B.V. Model F28 Mark 0070 and 0100 airplanes.

AD 2012- 22-05 required inspecting for cracks of the pistons on the main landing gear (MLG), and replacing the affected pistons if necessary. AD 2012-22-05 also required modifying the MLG, and revising the airplane maintenance program. AD 2018-19-03 required an inspection of the MLG, and replacement if necessary.

This AD retains the requirements of AD 2012-22-05, expands the applicability, and requires a new modification or replacement of the MLG; as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference.

This AD was prompted by a determination that the required heat treatment may not have been applied to certain MLG pistons.

DATES: This AD becomes effective March 24, 2020. The FAA must receive comments on this AD by April 23, 2020.

COST: The FAA estimates that this AD affects 0 (zero) airplanes of U.S. registry. If an affected airplane is imported and
placed on the U.S. Register in the future, the FAA provide the following cost estimates to comply with this AD:

  • Retained actions from AD 2012- 22-05: 24 work-hours × $85 per hour = $2,040 per airplane.
  • New actions: 24 work-hours × $85 per hour = $2,040 per airplane.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC