Orion Abort System Test Successful | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 07, 2010

Orion Abort System Test Successful

Would Pull Crew To Safety In The Event Of A Launch Pad Emergency

Potential major changes in the NASA budget not withstanding, NASA's Pad Abort 1 flight test, a launch of the abort system designed for the Orion crew vehicle, lifted off at 0700 MDT Thursday at the U.S. Army's White Sands Missile Range (WSMR) near Las Cruces, NM. The flight lasted about 135 seconds from launch until the crew module touchdown about a mile north of the launch pad.


NASA Photo

The flight was the first fully-integrated test of this launch abort system design. The information gathered from the test will help refine design and analysis for future launch abort systems, resulting in safer and more reliable crew escape capability during rocket launch emergencies.

"Through hard work and incredible dedication over the past several years, the Orion Pad Abort 1 team has successfully tested the first U.S. designed abort system since Apollo," said Doug Cooke, associate administrator for the Exploration Systems Mission Directorate at NASA Headquarters in Washington. "This system is much more advanced in capability and technology than any abort system designed in the past. NASA strives to make human spaceflight as safe as possible, and what we learned here today will greatly contribute to that goal."


NASA Artist's Concept

The test involved three motors. An abort motor produced a momentary half-million pounds of thrust to propel the crew module away from the pad. It burned for approximately six seconds, with the highest impulse in the first 2.5 seconds. The crew module reached a speed of approximately 445 mph in the first three seconds, with a maximum velocity of 539 mph, in its upward trajectory to about 1.2 miles high.

The attitude control motor fired simultaneously with the abort motor and steered the vehicle using eight thrusters producing up to 7,000 pounds of thrust. It provided adjustable thrust to keep the crew module on a controlled flight path and reorient the vehicle as the abort system burned out.


NASA Artist's Concept

The jettison motor, the only motor of the three that would be used in all nominal rocket launches, pulled the entire launch abort system away from the crew module and cleared the way for parachute deployment and landing. After explosive bolts fired and the jettison motor separated the system from the crew module, the recovery parachute system deployed. The parachutes guided the crew module to touchdown at 16.2 mph (24 feet per second), about one mile from the launch pad.


NASA Photo

The Orion Project has begun the process of recovering all of the test articles from the WSMR range and will be evaluating all of the data over the coming weeks.

The Orion Project office at NASA's Johnson Space Center in Houston led the launch abort system test team. System development is led by NASA's Langley Research Center in Hampton, VA, in partnership with NASA's Marshall Space Flight Center in Huntsville, Ala. Langley designed and produced the boilerplate crew module for the flight test.

FMI: www.nasa.gov/orion  

 


Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC