New Date Set For Full-Scale NASA/ATK Ares I Solid Rocket Motor Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Sep 07, 2009

New Date Set For Full-Scale NASA/ATK Ares I Solid Rocket Motor Test

First Ground Test of the Ares I Five-Segment Solid Rocket Motor Re-Sked

Alliant Techsystems Space Systems and NASA have finally identified the issue that resulted in the scrub of last week's test of the Ares 1 solid rocket motor system. A component of the ground controller unit, which sends power to the system that moves the nozzle during the test, failed and has been replaced.

The test has been rescheduled for Thursday, Sept. 10. Final testing of the ground system has continued over the weekend and early next week. The current schedule calls for the test to go off at 1300 MDT, at the ATK Space Systems facility in Promontory, Utah.

Test Objectives:

  • A total of 46 design objectives will be measured through 650 instrument channels
  • The Ares I design is based on the design of the space shuttle's four-segment booster
  • The addition of the fifth segment will increase the maximum thrust performance to approximately 3.6 million pounds
  • The first stage of Ares I has been under development since 2005. It measures 12 feet in diameter and 154 feet in length
  • The cases have all previously flown on the space shuttle, collectively launching on 48 missions--including STS-1

If you happen to live locally, a public viewing area is available along State Road 83 North approximately 20 miles west of Corinne, Utah.

FMI: www.atk.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC