KC-46 Tanker Program Successfully Completes Preliminary Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, May 10, 2012

KC-46 Tanker Program Successfully Completes Preliminary Design Review

Critical Design Review Set For 2013

The KC-46 Tanker program has completed a Preliminary Design Review (PDR) with the U.S. Air Force, a key milestone in the development of the next-generation aerial refueling tanker. The review, which began March 21 and ended April 27, demonstrated that the preliminary design of the KC-46A Tanker meets system requirements and establishes the basis for proceeding with detailed design. Boeing remains on plan to deliver 18 combat-ready KC-46A Tankers by 2017.

"I'm happy with Boeing's performance. They're maintaining a very tight focus on meeting commitments and staying on or ahead of schedule. The program remains on a good path," said Air Force Maj. Gen. Chris Bogdan, KC-46 Program executive officer. "This is important news for the nation's warfighters, because it reaffirms our commitment to delivering the KC-46A tanker on schedule."

The program's next major milestone is a Critical Design Review (CDR) that will take place in the summer of 2013. The CDR will determine that the design of the KC-46A is mature and ready to proceed to the manufacturing phase. "The KC-46 team is designing an aircraft that will offer superior, modern multi-role capabilities for the warfighter, including advanced refueling systems and military avionics, and the ability to transport cargo, passengers and patients," said Maureen Dougherty, Boeing KC-46 Tanker vice president and program manager. "Working closely with our Air Force teammates, we've made tremendous progress in the past 14 months and have the foundation in place to enter the detailed design phase."

In addition to the successful PDR, the Boeing KC-46 team has completed several major milestones on or ahead of schedule over the past year that include a System Requirements Review, Integrated Baseline Review, 767-2C PDR, and Firm Configuration Reviews for the 767-2C and the KC-46A Tanker.

Boeing will build 179 next-generation aerial refueling tanker aircraft that will begin to replace the Air Force's fleet of 416 KC-135 tankers.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC