NASA Administrator Marks Completion Of World’s Largest Spacecraft Welding Tool | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Sep 09, 2014

NASA Administrator Marks Completion Of World’s Largest Spacecraft Welding Tool

Space Launch System Assembly Mechanism To Be Unveiled September 12

NASA’s new Vertical Assembly Center (VAC), a 170-foot-high marvel of machinery that will be used to assemble elements of the agency's Space Launch System (SLS), is now complete and ready to weld parts for the rocket that is designed to send humans on deep space missions.

NASA Administrator Charles Bolden will be among those to attend the ribbon cutting for the enormous new tool at 11 a.m. EDT Friday, Sept. 12, at the agency's Michoud Assembly Facility in New Orleans where the core stage is being built.

The Vertical Assembly Center will be used to join domes, rings and barrels segments to complete the SLS fuel tanks. The tool also will be used to perform evaluations of the completed welds. Towering more than 200 feet tall, with a diameter of 27.6 feet, the core stage will store cryogenic liquid hydrogen and liquid oxygen to feed the vehicle’s RS-25 engines.

Bolden also will visit NASA's Stennis Space Center near Bay St. Louis, Mississippi, following the Michoud events to tour the historic B-2 Test Stand, along with other NASA representatives. The B-2 Test Stand was used to test the S-1C stage on the Saturn V moon rocket and the Main Propulsion Test Article, the configuration of three main engines flown on space shuttle missions. The stand will next be used to test the core stage of SLS and its configuration of four RS-25 engines.

(NASA artist's depiction of SLS launch)

FMI: www.nasa.gov/sls

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC