AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Sep 17, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-17-04

PRODUCT: Certain Airbus SAS Model A350-941 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-06-09, which applied to the aircraft listed above.

AD 2019-06-09 required repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, as specified in an EASA AD, which was incorporated by reference.

This new AD continues to require repetitive tightness checks of the baby bassinet inserts installed on stowages and partitions and, depending on findings, accomplishment of applicable corrective actions, and also requires modification of the baby bassinet inserts, which constitutes terminating action for the repetitive tightness checks; as specified in an EASA AD, which is incorporated by reference.

This AD was prompted by reports that baby bassinet inserts installed on airplane stowages and partitions were found loose because a self-securing fixation device (Loctite) had not been applied.

DATES: This AD becomes effective September 27, 2019. Comments must be received by October 28, 2019.

COST: The FAA estimates that this AD affects no affected U.S.-registered airplanes. If an affected airplane is imported and
placed on the U.S. Register in the future, operators may incur the following costs in order to comply with this AD:

Required Actions:

  • Retained actions from AD 2019-06-09: 1 work-hours × $85 per hour = $85.
  • New actions: Up to 3 work-hours × $85 per hour = Up to $255.

On Condition Costs:

  • Labor: 1 work-hour × $85 per hour = $85.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC