AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Mar 02, 2021

AD: Bombardier, Inc., Airplanes

AD 2021-03-17 Requires An Inspection To Determine The Last Replacement Date Of The ELB

The FAA is adopting a new airworthiness directive (AD) for certain Bombardier, Inc., Model BD-700-1A10 airplanes.

This AD was prompted by a report of smoke and signs of an overheating condition from the emergency light battery (ELB) due to excessive corrosion surrounding the internal lead acid batteries, which caused an electrical short circuit that led to the smoke and overheating condition. This AD requires an inspection to determine the last replacement date of the ELB, and replacement if necessary. This AD also requires the incorporation of a new maintenance task into the existing maintenance or inspection program. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective March 30, 2021.

Supplementary Information: Transport Canada Civil Aviation (TCCA), which is the aviation authority for Canada, has issued Canadian AD CF-2020-07, dated March 17, 2020 (also referred to as the Mandatory Continuing Airworthiness Information, or the MCAI), to correct an unsafe condition for certain Bombardier, Inc., Model BD-700-1A10 airplanes. You may examine the MCAI in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2020-0843.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain Bombardier, Inc., Model BD-700-1A10 airplanes. The NPRM published in the Federal Register on September 17, 2020 (85 FR 58010). The NPRM was prompted by a report of smoke and signs of an overheating condition from the ELB due to excessive corrosion surrounding the internal lead acid batteries, which caused an electrical short circuit that led to the smoke and overheating condition. The NPRM proposed to require an inspection to determine the last replacement date of the ELB, and replacement if necessary. The NPRM also proposed to require the incorporation of a new maintenance task into the existing maintenance or inspection program. The FAA is issuing this AD to address smoke and an overheating condition of the ELB due to corrosion, which could cause fire onboard the airplane. See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC