AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Feb 28, 2020

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2020-03-21

PRODUCT: Certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes.

ACTION: Final rule; request for comments.

SUMMARY:  This AD was prompted by reports that main landing gear (MLG) trailing arm assemblies were found with compromised paint finish and corrosion on the axle bore inner diameters due to improper removal of contaminants during manufacturing.

This AD requires a one-time inspection to determine if an affected MLG trailing arm assembly is installed, repetitive detailed inspections of the inner diameter of the affected MLG trailing arm assembly axle bore for surface finish discrepancies, corrective actions if necessary, and eventual replacement of primer and paint and application of corrosion preventive compound on the inner diameter of all affected MLG trailing arm assembly axle bores, which terminates the repetitive inspections.

DATES: This AD becomes effective March 12, 2020. The FAA must receive comments on this AD by April 13, 2020.

COST: The FAA estimates that this AD affects 49 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Required Actions

  • Labor: Up to 33 work-hours × $85 per hour = Up to $2,805.
  • Parts: Up to $200,000.
  • Cost per airplane: Up to $202,805.

On Condition Costs

  • Labor: Up to 20 work-hours × $85 per hour = Up to $1,700.
  • Parts: Up to $200,000.
  • Cost per airplane: Up to $201,700.

According to the manufacturer, some or all of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC