Boeing May See ETOPS Restricted For Dreamliner | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 28, 2013

Boeing May See ETOPS Restricted For Dreamliner

Situation Could Be Temporary While New Battery System Is Certified

One of the appeals of the 787 Dreamliner was its ability to travel long distances over oceans with just two engines ... its Extended Range Twin Engine Operational Performance, or ETOPS. But as the planemaker works to certify a new battery system, word comes that the FAA may limit the ETOPS range of the airplane, at least temporarily.

AirWise reports that Seattle aviation analyst Scott Hamilton said that, if the FAA limits the Dreamliner to over-land flights, it would be a "very damaging blow" to the program. The Leeham analyst said not allowing the airplane to fly over water would "undermine the business case for the airplane."

Another option reportedly under consideration would be to limit the airplane's flight time over water to two hours. A source in Japan said that it would be "completely within expectations" for the FAA to place a limit on ETOPS, which would cause Japanese operators to fly less direct routes and lose efficiency.

The FAA said it was too early to say if the ETOPS certification would be cancelled, modified, or left alone. The agency said through a spokesperson that they would be in a better position to answer that question after the battery testing is completed. Boeing is in the process of flight-testing the new battery system, and says that the FAA may lift its ban on revenue flights soon.

But limiting the ETOPS would mean that routes like Boston to Tokyo would not be in the airplane's range, and the return to full long-range ETOPS flights would likely be an incremental process, analysts said.

(Battery enclosure image provided by Boeing)

FMI: www.faa.gov, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC