First Full GE9X Engine Begins Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Apr 13, 2016

First Full GE9X Engine Begins Testing

Ground Runs Underway At GE Peebles Facility In OH

Ground testing in underway on the first full GE9X development engine, which is the world's largest commercial aircraft engine, at GE Aviation's Peebles Testing Operation in Ohio. The GE9X engine will power Boeing's new 777X aircraft.

"The entire GE9X team-from engineering to sourcing to supply chain to development assembly-devoted countless hours to enable this achievement to occur," said Bill Millhaem, general manager of the GE90/GE9X engine programs at GE Aviation. "The ground testing will generate data on the full engine system and aerodynamic performance, mechanical verification, and aero thermal system validation."
 
"We would like to convey our congratulations to the GE team for its achievement of this milestone," said Bob Feldmann, Boeing 777X vice president and general manager. "GE's commitment to technology maturation throughout the GE9X development program continues to deliver results for the 777X program. We look forward to working together with GE to deliver this great airplane to our customers."
 
Maturation testing of the GE9X engine began about five years ago and has progressed from component-level all the way to the first full engine to test (FETT). FETT brings all the GE9X technologies together to demonstrate their operability as a complete propulsion system.
 
Compared to other engine programs, the GE9X FETT happened earlier in the development process, just a mere six months after the engine design was finalized. This timing assures all learnings from FETT will be captured in the certification engines. Next year will be a busy year for the GE9X program with the start of certification testing and flight testing on GE Aviation's flying test bed. Engine certification is anticipated in 2018.

With almost 700 GE9X engines on order, the GE9X engine will be in the 100,000 pound thrust class and will have the largest front fan at 134 inches in diameter with a composite fan case and 16 fourth generation carbon fiber composite fan blades. Other key features include; a next-generation 27:1 pressure-ratio 11-stage high-pressure compressor; a third-generation TAPS III combustor for high efficiency and low emissions; and CMC material in the combustor and turbine.

(Image provided with GE Aviation news release)

FMI: www.ge.com/aviation

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC