RV-10 Kits To Be Produced With Final-Size Holes Drilled | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Aug 04, 2020

RV-10 Kits To Be Produced With Final-Size Holes Drilled

RV-10 Construction Just Got A LOT Easier

Van’s Aircraft has initiated the process of phasing in the production of final-size, matched-hole RV-10 parts. Until now, all parts for the RV-10 have been produced with slightly undersized holes, which the builder must up-size with a drill and then debur prior to assembly.

The company notes that, "We will be transitioning the RV-10 kit to final-sized holes, much like the RV-14 and RV-12iS kits. There is no increase in kit prices associated with this planned change.

We are excited to remove a portion of the initial work that builders need to perform on certain parts of the RV-10 airframe assembly with this change. Aircraft parts with final-size holes may be dimpled and then assembled right out of the box, after deburring the edges of each part as needed. This removes the need to first cleco the parts together, drill them to size in assembly, then disassemble and debur.

This manufacturing transition will take place over the next several months (we anticipate completing the transition sometime in early 2021). During the transition period, customers may receive some portion of their parts with final-sized holes and others without. Van’s will mark delivered kit parts to make the builder aware whether each part needs to be final-drilled and deburred, or not. We will also include instructions for the builder explaining how to identify which kit parts are/are not final-sized."

FMI: www.vansaircraft.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC