USAF: Existing Huey Bases Will Receive Replacement Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 26, 2018

USAF: Existing Huey Bases Will Receive Replacement Aircraft

New Helicopter Choice Will Be Announced Later This Year

The Air Force has announced that each UH-1N Huey location will receive replacement aircraft.

The Air Force is replacing the UH-1N Huey 46-year-old fleet by procuring new replacement aircraft to support four missions - Nuclear Deterrence Operations, Continuation of Government Operations, Survival School support, and Test and Training.

Current UH-1N Huey locations include Eglin Air Force Base's Duke Field, Florida; Fairchild AFB, Washington; FE Warren AFB, Wyoming; Joint Base Andrews-Naval Air Facility Washington, Maryland; Kirtland AFB, New Mexico; Malmstrom AFB, Montana; and Minot AFB, North Dakota.

The Air Force UH-1N Huey replacement program supports the Defense Department's principal priority to maintain a safe, secure and effective nuclear deterrent that safeguards the homeland, assures allies and deters adversaries. The replacement for the UH-1N Huey will feature significant improvements in the areas of speed, range, endurance, payload capacity and survivability.

Each stateside active duty UH-1N Huey location will receive replacement aircraft pending the outcome of the environmental analysis.

The 2016 Vice Chairman of the Joint Chiefs of Staff Joint Requirements Oversight Council approved the purchase of new aircraft to replace the 46-year-old UH-1N Huey fleet. A contract award for the new aircraft is anticipated later this year with deliveries planned for 2020-2032.

(Image provided with USAF news release)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC