First Landing On An Unpaved Runway For The PC-24 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 26, 2018

First Landing On An Unpaved Runway For The PC-24

Aircraft Undergoing A Post-Certification Test Program

The PC-24 made its first landing on an unpaved runway. The aircraft is currently undergoing a program of post-certification tests with special emphasis on unpaved runway operations. Pilatus plans on obtaining “Rough Field” certification in the fourth quarter of 2018.

Woodbridge Airfield to the north east of London offers optimum test conditions. Pilatus spent two weeks there testing the PC-24’s landing and take-off capabilities on the airfield’s unpaved runway for the first time.

From the outset, the PC-24 was designed for “off road” operations. Its outstanding performance on short unpaved runways opens up an incredible degree of flexibility and new opportunities. The PC-24 provides access to almost twice as many airports worldwide compared to other jets currently available on the market.

"What a picture – the PC-24 in the toughest conditions, using an unpaved runway for the first time! This sort of mission would not be conceivable without the PC-24’s rugged landing gear, clever flap systems and special wing design. The PC-24 was designed with exactly this sort of operation in mind – that’s Swiss engineering at its very best,” said Oscar J. Schwenk, Chairman of Pilatus.

Pilatus obtained basic certification for the PC-24 on 7 December 2017. Since that date, five aircraft have been delivered to customers in Europe and the USA. A total of 23 PC-24s are scheduled for delivery in 2018. The Royal Flying Doctor Service of Australia (RFDS) will use the PC-24 for medevac missions in Australia from 2019, which will obviously involve landing on and taking off from short unpaved runways. The PC-24 order book is closed for the time being. Pilatus plans to accept new orders in 2019.

(Image provided with Pilatus news release)

FMI: www.pilatus-aircraft.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC