Boeing 747-8 Freighter Arrives In SoCal For Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Apr 21, 2010

Boeing 747-8 Freighter Arrives In SoCal For Flight Tests

Majority Of Testing Will Be Based In Palmdale

The second Boeing747-8 Freighter, RC521, landed in Palmdale, CA, Monday, marking the beginning of a planned transition of 747-8 Freighter testing to Southern California. The more than four-hour flight from Boeing Field in Seattle included testing on avionics and cruise performance.

"Taking the airplane to Palmdale is a big step," said Mo Yahyavi, vice president and general manager of the 747 program. "The team is focused on ensuring a seamless transition into the next phase of the flight-test program as we prepare to expand testing of the 747-8 Freighter's performance characteristics."

The airplane will be stationed in Palmdale for the majority of its scheduled flight-test program. The crew will conduct several tests on the airplane with fuel-mileage and engine-performance testing as key focus areas.

"Palmdale provides an excellent test environment for the 747-8 Freighter," said Andy Hammer, 747 test program manager. "It allows us to take full advantage of one of the world's premier experimental test flight facilities and the excellent weather conditions to meet our flight-test requirements on the road to obtaining our amended type certification."

A contingent of employees has been stationed at Palmdale for the testing, including flight-test engineers and the support personnel who prepare the airplane for each day's flights. In the coming weeks, the two other 747-8 airplanes in the flight-test fleet will join RC521 in Southern California.

The entire flight-test program calls for the three airplanes to perform a total of about 3,700 hours of ground and air testing. The first 747-8 Freighter delivery to Cargolux is planned for the fourth quarter of this year.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC